
Bagalur Cross Metro Station
ಬಾಗಲೂರು ಕ್ರಾಸ್
Station Code: Not officially released
About Bagalur Cross
Bagalur Cross Metro Station: Blue Line, Namma Metro
Bagalur Cross Metro Station is an elevated station on the Blue Line of Namma Metro in Bengaluru, on Bellary Road (NH 44) at Bagalur Cross. It is on the airport line (Phase 2B) and serves Bagalur Cross, Kattigenahalli and the North Gate business parks on Bellary Road. The Blue Line will run 58.19 km from Central Silk Board along the Outer Ring Road to KR Puram, then north through Hebbal to Kempegowda International Airport, with 29 stations. The station is under construction and not open yet.
In Kannada: ಬಾಗಲೂರು ಕ್ರಾಸ್.
Bagalur Cross is where Bagalur Road branches off the airport highway. The station serves the car showrooms and offices along the highway, the North Gate Business Park and Sattva Horizon, and the fast-growing apartments towards Kattigenahalli and Bagalur.
Bagalur Cross Metro Station Opening Date
This station is on Phase 2B, the 38.44 km airport line from KR Puram through Nagawara, Hebbal and Yelahanka to the KIAL Terminals, with 16 stations. Phase 2B is behind Phase 2A: the ORR section from Silk Board to KR Puram is in trial runs and expected in 2027, while reported targets for the airport line range from late 2027 to 2028. BMRCL has not announced an official date, so treat 2028 as a target, not a promise.
Expected opening: Around 2028, target only (Phase 2B airport line; no official date). Status verified 15 November 2026.
Where Bagalur Cross is on the Blue Line
The previous station towards Central Silk Board is Yelahanka (about 2.2 km) and the next station towards the airport is Doddajala (about 8.5 km). Bagalur Cross will be 25 stops (about 62 min) from Central Silk Board (Yellow Line); 13 stops (about 32 min) from KR Puram (Purple Line); 7 stops (about 18 min) from Nagawara (Pink Line); and 3 stops (about 8 min) from KIAL Terminals at the airport. Times assume Namma Metro’s usual pace of about 2.5 minutes a stop (our estimate until BMRCL publishes running times).
See every station in order on the Blue Line page, and the trial-run timeline in our Blue Line guide.
What is near Bagalur Cross Metro Station
- Sattva Horizon: about 236 m, 4 min walk
- North Gate Business Park: about 502 m, 8 min walk
- MVM Institute of Nursing Sciences: about 559 m, 9 min walk
Straight-line distances from the station site (OpenStreetMap); walking times are estimates. Station exits have not been announced, so the walk may change once the gates are known.
Getting to the metro from Bagalur Cross today
No metro station is open nearby; Yeshwanthpura on the Green Line is about 12.5 km away. Airport and city buses stop along Bellary Road. Compare routes and fares on Plan Trip.
Bagalur Cross Metro Station Timings and Fares
First and last train times and fares have not been published, because the Blue Line has not opened. Namma Metro charges by distance; if the Blue Line follows the current fare slabs, a trip of up to 2 stops would cost about ₹10 and Central Silk Board to KR Puram about ₹60, but airport fares may be set differently. We will publish verified timings here as soon as BMRCL releases the timetable. Fares for open lines: metro fare calculator.
Facilities at Bagalur Cross Metro Station
The station is not open, so BMRCL has not confirmed its exits, parking or facilities. We do not list facilities we have not verified; this page will be updated when the station opens.
Bagalur Cross Metro Station Map & Route Map
Location
Bagalur Cross Metro Station, Bengaluru
Bellary Road, Bagalur Cross, Bengaluru, Karnataka 560064
Station Under Construction
This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: Around 2028, target only (Phase 2B airport line; no official date)
Frequently Asked Questions
Explore near Bagalur Cross
Neighbourhood Guide
PGs & Hostels near Bagalur Cross
- Rent bands, deposit norms and best gates to enter
- Commute times to tech corridors & colleges
