Trial runs · Silk Board–KR Puram expected 2027

Blue Line

Namma Metro's 58.19 km Outer Ring Road and airport line, 29 stations from Central Silk Board via KR Puram and Hebbal to Kempegowda International Airport. Trial runs began in November 2026; the Silk Board–KR Puram section is expected in 2027 and the airport section around 2028 (targets, not official dates).

Stations29
Namma MetroBengaluru, India
Line Length
58.19 km
Max Speed
80 km/h
Track Config
2 Tracks
Ridership
High Capacity

Major Interchange Hubs

Strategic network junctions connecting multiple transit corridors.

Station Journey Path

All 29 stations, Central Silk Board to the airport. Phase 2A (first 13, along the ORR) is expected in 2027; Phase 2B around 2028. Targets, not official dates.

About the Blue Line

Trial runs started, first section expected in 2027

The Blue Line is Namma Metro's Outer Ring Road and airport line. It runs 58.19 km from Central Silk Board along the Outer Ring Road through HSR Layout, Bellandur and Marathahalli to KR Puram, then north through Nagawara, Hebbal and Yelahanka to Kempegowda International Airport, with 29 stations. No station is open yet.

Since 30 October 2026 power has been switched on in stages from Baiyappanahalli depot towards Marathahalli, and test trains run towards KR Puram and Doddanekundi; BMRCL's target was trains to Marathahalli by 15 November. Signalling is the key pending item, then speed and safety trials and the CMRS inspection. Passenger service on the first section is expected in 2027 (reported targets range from May to mid-2027) and the airport section around 2028. These are targets, not official dates. Full trial-run timeline.

Phase 2A: Outer Ring Road (19.75 km, 13 elevated stations)

Phase 2B: Airport line (38.44 km, 16 stations)

Interchanges

  • Central Silk Board: Yellow Line (open). The two stations are separate; a walkway is planned but not expected before May 2027.
  • KR Puram: Purple Line (open) and KR Puram railway station.
  • Nagawara: Pink Line (underground section expected around May 2027).
  • Agara and Ibbaluru: the approved Red Line (Sarjapur–Hebbal). Kempapura and Hebbal: the approved Phase 3 lines.

What it changes

Central Silk Board to KR Puram is 60 to 85 minutes by car at 9 AM (Google Maps). On the Blue Line it will be 12 stops, about 30 minutes by our estimate, with no change of train. Fares have not been announced; if the Blue Line follows the current slabs, Silk Board to KR Puram would be about ₹60. Trains are built by BEML and run on 750 V third-rail power with Alstom CBTC signalling; depots are at Baiyappanahalli and Doddajala.