HSR Layout Blue Line metro station under construction, March 2025
Blue LineUnder Construction

HSR Layout Metro Station

ಎಚ್‌ ಎಸ್‌ ಆರ್ ಬಡಾವಣೆ

Station Code: Not officially released

Outer Ring Road, HSR Layout, Bengaluru, Karnataka 560034

About HSR Layout

HSR Layout Metro Station: Blue Line, Namma Metro

HSR Layout Metro Station is an elevated station on the Blue Line of Namma Metro in Bengaluru, on the Outer Ring Road between Central Silk Board and Agara. It is on the Outer Ring Road section (Phase 2A) and serves HSR Layout and the Parangipalya side of the Outer Ring Road. The Blue Line will run 58.19 km from Central Silk Board along the Outer Ring Road to KR Puram, then north through Hebbal to Kempegowda International Airport, with 29 stations. The station is under construction and not open yet.

In Kannada: ಎಚ್‌ ಎಸ್‌ ಆರ್ ಬಡಾವಣೆ.

HSR Layout is the first stop east of Central Silk Board, so for many people in HSR the Blue Line will mean one stop to the Yellow Line and Electronic City, or a straight ride along the ORR to Bellandur, Marathahalli and KR Puram without touching the Silk Board junction by road. The station sits on the ORR edge of the layout, close to the start-up offices, clinics and colleges that line this stretch.

HSR Layout Metro Station Opening Date

This station is on Phase 2A, the 19.75 km Outer Ring Road section from Central Silk Board to KR Puram with 13 elevated stations. Since 30 October 2026 power has been switched on in stages from Baiyappanahalli depot towards Marathahalli, and test trains have started running towards KR Puram and Doddanekundi. BMRCL’s next target was to run trial trains to Marathahalli by 15 November. Signalling integration is the key pending item, along with about 2 km of track and the stations at Marathahalli and Central Silk Board. After that come speed and safety trials and the inspection by the Commissioner of Metro Railway Safety (CMRS); passengers can ride only after CMRS approval.

Reported targets for passenger service on this section range from May to mid-2027. BMRCL has not announced an official date, and Namma Metro dates have slipped before, so treat 2027 as a target, not a promise. Early service could also start in segments and skip Marathahalli and Central Silk Board until those two stations are ready.

Expected opening: 2027, target only (Phase 2A, Silk Board–KR Puram; trial runs began November 2026; no official date). Status verified 15 November 2026.

Where HSR Layout is on the Blue Line

The previous station towards Central Silk Board is Central Silk Board (about 1.1 km) and the next station towards the airport is Agara (about 1.2 km). HSR Layout will be 1 stop (about 2 min) from Central Silk Board (Yellow Line); 11 stops (about 28 min) from KR Puram (Purple Line); 17 stops (about 42 min) from Nagawara (Pink Line); and 27 stops (about 68 min) from KIAL Terminals at the airport. Times assume Namma Metro’s usual pace of about 2.5 minutes a stop (our estimate until BMRCL publishes running times).

See every station in order on the Blue Line page, and the trial-run timeline in our Blue Line guide.

What is near HSR Layout Metro Station

  • Vidhya Bharathi College: about 148 m, 2 min walk
  • Bhagavathi Multi Speciality Hospital: about 256 m, 4 min walk
  • Sakra IKOC Multispeciality Hospital: about 300 m, 5 min walk
  • IndiQube offices: about 323 m, 5 min walk

Straight-line distances from the station site (OpenStreetMap); walking times are estimates. Station exits have not been announced, so the walk may change once the gates are known.

Getting to the metro from HSR Layout today

The nearest open station is Bommanahalli on the Yellow Line, about 1 km away, with Central Silk Board about 1.4 km away. From either you can ride the Yellow Line to RV Road, Jayadeva Hospital (change for the Pink Line) or Electronic City. Compare routes and fares on Plan Trip.

HSR Layout Metro Station Timings and Fares

First and last train times and fares have not been published, because the Blue Line has not opened. Namma Metro charges by distance; if the Blue Line follows the current fare slabs, a trip of up to 2 stops would cost about ₹10 and Central Silk Board to KR Puram about ₹60, but airport fares may be set differently. We will publish verified timings here as soon as BMRCL releases the timetable. Fares for open lines: metro fare calculator.

Facilities at HSR Layout Metro Station

The station is not open, so BMRCL has not confirmed its exits, parking or facilities. We do not list facilities we have not verified; this page will be updated when the station opens.

HSR Layout Metro Station Map & Route Map

Location

HSR Layout Metro Station, Bengaluru

Outer Ring Road, HSR Layout, Bengaluru, Karnataka 560034

Open in Maps
🚧

Station Under Construction

This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: 2027, target only (Phase 2A, Silk Board–KR Puram; trial runs began November 2026; no official date)

Frequently Asked Questions

Explore near HSR Layout

Neighbourhood Guide

PGs & Hostels near HSR Layout

  • Rent bands, deposit norms and best gates to enter
  • Commute times to tech corridors & colleges
View neighbourhood guide

Stations on the Same Line

View all