
DRDO Sports Complex Metro Station
ಬಾಗ್ಮನೆ ಡೆವಲಪರ್ಸ್ - ರ.ಸಂ.ಅ.ಸಂ. ಕ್ರೀಡಾ ಸಂಕೀರ್ಣ
Station Code: Not officially released
About DRDO Sports Complex
DRDO Sports Complex Metro Station: Blue Line, Namma Metro
DRDO Sports Complex Metro Station is an elevated station on the Blue Line of Namma Metro in Bengaluru, on the Outer Ring Road at Mahadevapura. It is on the Outer Ring Road section (Phase 2A) and serves Mahadevapura, Mahadevapura Lake and the Bagmane World Technology Center belt. The Blue Line will run 58.19 km from Central Silk Board along the Outer Ring Road to KR Puram, then north through Hebbal to Kempegowda International Airport, with 29 stations. The station is under construction and not open yet.
Official name: Bagmane Developers – DRDO Sports Complex (sponsored). In Kannada: ಬಾಗ್ಮನೆ ಡೆವಲಪರ್ಸ್ – ರ.ಸಂ.ಅ.ಸಂ. ಕ್ರೀಡಾ ಸಂಕೀರ್ಣ.
Its official name is Bagmane Developers – DRDO Sports Complex: Bagmane paid about ₹40 crore for the naming rights. The station sits between Mahadevapura Lake and the Bagmane World Technology Center campus, close to the Samsung Semiconductor and Google Ananta offices.
DRDO Sports Complex Metro Station Opening Date
This station is on Phase 2A, the 19.75 km Outer Ring Road section from Central Silk Board to KR Puram with 13 elevated stations. Since 30 October 2026 power has been switched on in stages from Baiyappanahalli depot towards Marathahalli, and test trains have started running towards KR Puram and Doddanekundi. BMRCL’s next target was to run trial trains to Marathahalli by 15 November. Signalling integration is the key pending item, along with about 2 km of track and the stations at Marathahalli and Central Silk Board. After that come speed and safety trials and the inspection by the Commissioner of Metro Railway Safety (CMRS); passengers can ride only after CMRS approval.
Reported targets for passenger service on this section range from May to mid-2027. BMRCL has not announced an official date, and Namma Metro dates have slipped before, so treat 2027 as a target, not a promise. Early service could also start in segments and skip Marathahalli and Central Silk Board until those two stations are ready.
Expected opening: 2027, target only (Phase 2A, Silk Board–KR Puram; trial runs began November 2026; no official date). Status verified 15 November 2026.
Where DRDO Sports Complex is on the Blue Line
The previous station towards Central Silk Board is Doddanekundi (about 1.3 km) and the next station towards the airport is Saraswathi Nagara (about 1.0 km). DRDO Sports Complex will be 10 stops (about 25 min) from Central Silk Board (Yellow Line); 2 stops (about 5 min) from KR Puram (Purple Line); 8 stops (about 20 min) from Nagawara (Pink Line); and 18 stops (about 45 min) from KIAL Terminals at the airport. Times assume Namma Metro’s usual pace of about 2.5 minutes a stop (our estimate until BMRCL publishes running times).
See every station in order on the Blue Line page, and the trial-run timeline in our Blue Line guide.
What is near DRDO Sports Complex Metro Station
- Samsung Semiconductor Research Institute: about 176 m, 3 min walk
- Mahadevapura Lake: about 206 m, 3 min walk
- Google Ananta: about 352 m, 6 min walk
- Bagmane World Technology Center: about 487 m, 8 min walk
Straight-line distances from the station site (OpenStreetMap); walking times are estimates. Station exits have not been announced, so the walk may change once the gates are known.
Getting to the metro from DRDO Sports Complex today
The nearest open station is Singayyanapalya on the Purple Line, about 1.2 km away; Garudacharapalya is about 1.6 km away. Compare routes and fares on Plan Trip.
DRDO Sports Complex Metro Station Timings and Fares
First and last train times and fares have not been published, because the Blue Line has not opened. Namma Metro charges by distance; if the Blue Line follows the current fare slabs, a trip of up to 2 stops would cost about ₹10 and Central Silk Board to KR Puram about ₹60, but airport fares may be set differently. We will publish verified timings here as soon as BMRCL releases the timetable. Fares for open lines: metro fare calculator.
Facilities at DRDO Sports Complex Metro Station
The station is not open, so BMRCL has not confirmed its exits, parking or facilities. We do not list facilities we have not verified; this page will be updated when the station opens.
DRDO Sports Complex Metro Station Map & Route Map
Location
DRDO Sports Complex Metro Station, Bengaluru
Outer Ring Road, Mahadevapura, Bengaluru, Karnataka 560093
Station Under Construction
This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: 2027, target only (Phase 2A, Silk Board–KR Puram; trial runs began November 2026; no official date)
Frequently Asked Questions
Explore near DRDO Sports Complex
Neighbourhood Guide
PGs & Hostels near DRDO Sports Complex
- Rent bands, deposit norms and best gates to enter
- Commute times to tech corridors & colleges
