Marathahalli Metro Station
ಮಾರತಹಳ್ಳಿ
Station Code: Not officially released
About Marathahalli
Marathahalli Metro Station: Blue Line, Namma Metro
Marathahalli Metro Station is an elevated station on the Blue Line of Namma Metro in Bengaluru, on the Outer Ring Road at the Marathahalli bridge junction. It is on the Outer Ring Road section (Phase 2A) and serves Marathahalli, Ashwath Nagar, Munnekollal and the Old Airport Road junction. The Blue Line will run 58.19 km from Central Silk Board along the Outer Ring Road to KR Puram, then north through Hebbal to Kempegowda International Airport, with 29 stations. The station is under construction and not open yet.
In Kannada: ಮಾರತಹಳ್ಳಿ.
Marathahalli is where the ORR meets Old Airport Road, a shopping street (Kalamandir, Brand Factory, KLM Fashion Mall) and one of the most congested junctions in the city. It is also the station everyone is watching right now: BMRCL’s target was to run trial trains from Baiyappanahalli depot to Marathahalli by 15 November 2026. The station itself was still being finished in November, and early service could skip it until it is ready.
Marathahalli Metro Station Opening Date
This station is on Phase 2A, the 19.75 km Outer Ring Road section from Central Silk Board to KR Puram with 13 elevated stations. Since 30 October 2026 power has been switched on in stages from Baiyappanahalli depot towards Marathahalli, and test trains have started running towards KR Puram and Doddanekundi. BMRCL’s next target was to run trial trains to Marathahalli by 15 November. Signalling integration is the key pending item, along with about 2 km of track and the stations at Marathahalli and Central Silk Board. After that come speed and safety trials and the inspection by the Commissioner of Metro Railway Safety (CMRS); passengers can ride only after CMRS approval.
Reported targets for passenger service on this section range from May to mid-2027. BMRCL has not announced an official date, and Namma Metro dates have slipped before, so treat 2027 as a target, not a promise. Early service could also start in segments and skip Marathahalli and Central Silk Board until those two stations are ready.
Expected opening: 2027, target only (Phase 2A, Silk Board–KR Puram; trial runs began November 2026; no official date). Status verified 15 November 2026.
Where Marathahalli is on the Blue Line
The previous station towards Central Silk Board is Kadubeesanahalli (about 1.5 km) and the next station towards the airport is ISRO (about 1.2 km). Marathahalli will be 7 stops (about 18 min) from Central Silk Board (Yellow Line); 5 stops (about 12 min) from KR Puram (Purple Line); 11 stops (about 28 min) from Nagawara (Pink Line); and 21 stops (about 52 min) from KIAL Terminals at the airport. Times assume Namma Metro’s usual pace of about 2.5 minutes a stop (our estimate until BMRCL publishes running times).
See every station in order on the Blue Line page, and the trial-run timeline in our Blue Line guide.
What is near Marathahalli Metro Station
- KLM Fashion Mall: about 144 m, 2 min walk
- MGA Hospital: about 171 m, 3 min walk
- Kalamandir: about 207 m, 3 min walk
- Vinayaka Theatre: about 316 m, 5 min walk
- Brand Factory: about 425 m, 7 min walk
Straight-line distances from the station site (OpenStreetMap); walking times are estimates. Station exits have not been announced, so the walk may change once the gates are known.
Getting to the metro from Marathahalli today
The nearest open stations are Kundalahalli and Seetharamapalya on the Purple Line, both about 2.7 km away towards Whitefield. Buses along Old Airport Road and the ORR connect to them. Compare routes and fares on Plan Trip.
Marathahalli Metro Station Timings and Fares
First and last train times and fares have not been published, because the Blue Line has not opened. Namma Metro charges by distance; if the Blue Line follows the current fare slabs, a trip of up to 2 stops would cost about ₹10 and Central Silk Board to KR Puram about ₹60, but airport fares may be set differently. We will publish verified timings here as soon as BMRCL releases the timetable. Fares for open lines: metro fare calculator.
Facilities at Marathahalli Metro Station
The station is not open, so BMRCL has not confirmed its exits, parking or facilities. We do not list facilities we have not verified; this page will be updated when the station opens.
Marathahalli Metro Station Map & Route Map
Location
Marathahalli Metro Station, Bengaluru
Outer Ring Road, Marathahalli Bridge, Marathahalli, Bengaluru, Karnataka 560037
Station Under Construction
This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: 2027, target only (Phase 2A, Silk Board–KR Puram; trial runs began November 2026; no official date)
Frequently Asked Questions
Explore near Marathahalli
Neighbourhood Guide
PGs & Hostels near Marathahalli
- Rent bands, deposit norms and best gates to enter
- Commute times to tech corridors & colleges