Kadubeesanahalli Blue Line metro station under construction, March 2025
Blue LineUnder Construction

Kadubeesanahalli Metro Station

ಕಾಡುಬೀಸನಹಳ್ಳಿ

Station Code: Not officially released

Outer Ring Road, Kadubeesanahalli, Panathur, Bengaluru, Karnataka 560103

About Kadubeesanahalli

Kadubeesanahalli Metro Station: Blue Line, Namma Metro

Kadubeesanahalli Metro Station is an elevated station on the Blue Line of Namma Metro in Bengaluru, on the Outer Ring Road at Kadubeesanahalli. It is on the Outer Ring Road section (Phase 2A) and serves Kadubeesanahalli, Panathur and the offices between Devarabeesanahalli and Marathahalli. The Blue Line will run 58.19 km from Central Silk Board along the Outer Ring Road to KR Puram, then north through Hebbal to Kempegowda International Airport, with 29 stations. The station is under construction and not open yet.

Called Kodibeesanahalli in earlier plans. In Kannada: ಕಾಡುಬೀಸನಹಳ್ಳಿ.

Older plans called this station Kodibeesanahalli; BMRCL now calls it Kadubeesanahalli. It serves the office towers between Embassy TechVillage and Marathahalli, including Salarpuria Sattva Eminence and the Prestige Tech Park area, and the Panathur Road side where many people who work on the ORR rent their homes.

Kadubeesanahalli Metro Station Opening Date

This station is on Phase 2A, the 19.75 km Outer Ring Road section from Central Silk Board to KR Puram with 13 elevated stations. Since 30 October 2026 power has been switched on in stages from Baiyappanahalli depot towards Marathahalli, and test trains have started running towards KR Puram and Doddanekundi. BMRCL’s next target was to run trial trains to Marathahalli by 15 November. Signalling integration is the key pending item, along with about 2 km of track and the stations at Marathahalli and Central Silk Board. After that come speed and safety trials and the inspection by the Commissioner of Metro Railway Safety (CMRS); passengers can ride only after CMRS approval.

Reported targets for passenger service on this section range from May to mid-2027. BMRCL has not announced an official date, and Namma Metro dates have slipped before, so treat 2027 as a target, not a promise. Early service could also start in segments and skip Marathahalli and Central Silk Board until those two stations are ready.

Expected opening: 2027, target only (Phase 2A, Silk Board–KR Puram; trial runs began November 2026; no official date). Status verified 15 November 2026.

Where Kadubeesanahalli is on the Blue Line

The previous station towards Central Silk Board is Devarabeesanahalli (about 1.8 km) and the next station towards the airport is Marathahalli (about 1.5 km). Kadubeesanahalli will be 6 stops (about 15 min) from Central Silk Board (Yellow Line); 6 stops (about 15 min) from KR Puram (Purple Line); 12 stops (about 30 min) from Nagawara (Pink Line); and 22 stops (about 55 min) from KIAL Terminals at the airport. Times assume Namma Metro’s usual pace of about 2.5 minutes a stop (our estimate until BMRCL publishes running times).

See every station in order on the Blue Line page, and the trial-run timeline in our Blue Line guide.

What is near Kadubeesanahalli Metro Station

  • Marathahalli Police Station: about 119 m, 2 min walk
  • Salarpuria Sattva Eminence: about 139 m, 2 min walk
  • IndiQube Treya: about 203 m, 3 min walk
  • Prestige Tech Park: about 658 m, 11 min walk

Straight-line distances from the station site (OpenStreetMap); walking times are estimates. Station exits have not been announced, so the walk may change once the gates are known.

Getting to the metro from Kadubeesanahalli today

The nearest open stations are Kundalahalli and Seetharamapalya on the Purple Line, about 4 km away, reached through Marathahalli. ORR buses are the direct option until the Blue Line opens. Compare routes and fares on Plan Trip.

Kadubeesanahalli Metro Station Timings and Fares

First and last train times and fares have not been published, because the Blue Line has not opened. Namma Metro charges by distance; if the Blue Line follows the current fare slabs, a trip of up to 2 stops would cost about ₹10 and Central Silk Board to KR Puram about ₹60, but airport fares may be set differently. We will publish verified timings here as soon as BMRCL releases the timetable. Fares for open lines: metro fare calculator.

Facilities at Kadubeesanahalli Metro Station

The station is not open, so BMRCL has not confirmed its exits, parking or facilities. We do not list facilities we have not verified; this page will be updated when the station opens.

Kadubeesanahalli Metro Station Map & Route Map

Location

Kadubeesanahalli Metro Station, Bengaluru

Outer Ring Road, Kadubeesanahalli, Panathur, Bengaluru, Karnataka 560103

Open in Maps
🚧

Station Under Construction

This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: 2027, target only (Phase 2A, Silk Board–KR Puram; trial runs began November 2026; no official date)

Frequently Asked Questions

Explore near Kadubeesanahalli

Neighbourhood Guide

PGs & Hostels near Kadubeesanahalli

  • Rent bands, deposit norms and best gates to enter
  • Commute times to tech corridors & colleges
View neighbourhood guide

Stations on the Same Line

View all