
HBR Layout Metro Station
ಎಚ್ ಬಿ ಆರ್ ಬಡಾವಣೆ
Station Code: Not officially released
About HBR Layout
HBR Layout Metro Station: Blue Line, Namma Metro
HBR Layout Metro Station is an elevated station on the Blue Line of Namma Metro in Bengaluru, on the Outer Ring Road at HBR Layout. It is on the airport line (Phase 2B) and serves HBR Layout, Hennur and the Nagawara side of the ORR. The Blue Line will run 58.19 km from Central Silk Board along the Outer Ring Road to KR Puram, then north through Hebbal to Kempegowda International Airport, with 29 stations. The station is under construction and not open yet.
In Kannada: ಎಚ್ ಬಿ ಆರ್ ಬಡಾವಣೆ.
HBR Layout station serves HBR Layout’s blocks and the Hennur Road side of the ORR, with several hospitals within a short walk. It is one stop before Nagawara, where the Blue Line will meet the Pink Line.
HBR Layout Metro Station Opening Date
This station is on Phase 2B, the 38.44 km airport line from KR Puram through Nagawara, Hebbal and Yelahanka to the KIAL Terminals, with 16 stations. Phase 2B is behind Phase 2A: the ORR section from Silk Board to KR Puram is in trial runs and expected in 2027, while reported targets for the airport line range from late 2027 to 2028. BMRCL has not announced an official date, so treat 2028 as a target, not a promise.
Expected opening: Around 2028, target only (Phase 2B airport line; no official date). Status verified 15 November 2026.
Where HBR Layout is on the Blue Line
The previous station towards Central Silk Board is Kalyan Nagar (about 1.1 km) and the next station towards the airport is Nagawara (about 1.0 km). HBR Layout will be 17 stops (about 42 min) from Central Silk Board (Yellow Line); 5 stops (about 12 min) from KR Puram (Purple Line); 1 stop (about 2 min) from Nagawara (Pink Line); and 11 stops (about 28 min) from KIAL Terminals at the airport. Times assume Namma Metro’s usual pace of about 2.5 minutes a stop (our estimate until BMRCL publishes running times).
See every station in order on the Blue Line page, and the trial-run timeline in our Blue Line guide.
What is near HBR Layout Metro Station
- BDA Park: about 59 m, 2 min walk
- Altius Hospital: about 225 m, 4 min walk
- Good Shepherd Hospital: about 377 m, 6 min walk
- HOSMAT Hospital, Kalyan Nagar: about 535 m, 9 min walk
Straight-line distances from the station site (OpenStreetMap); walking times are estimates. Station exits have not been announced, so the walk may change once the gates are known.
Getting to the metro from HBR Layout today
The nearest open stations are Baiyappanahalli (about 5.2 km) and Swami Vivekananda Road (about 5.4 km) on the Purple Line. Compare routes and fares on Plan Trip.
HBR Layout Metro Station Timings and Fares
First and last train times and fares have not been published, because the Blue Line has not opened. Namma Metro charges by distance; if the Blue Line follows the current fare slabs, a trip of up to 2 stops would cost about ₹10 and Central Silk Board to KR Puram about ₹60, but airport fares may be set differently. We will publish verified timings here as soon as BMRCL releases the timetable. Fares for open lines: metro fare calculator.
Facilities at HBR Layout Metro Station
The station is not open, so BMRCL has not confirmed its exits, parking or facilities. We do not list facilities we have not verified; this page will be updated when the station opens.
HBR Layout Metro Station Map & Route Map
Location
HBR Layout Metro Station, Bengaluru
Outer Ring Road, HBR Layout, Bengaluru, Karnataka 560043
Station Under Construction
This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: Around 2028, target only (Phase 2B airport line; no official date)
Frequently Asked Questions
Explore near HBR Layout
Neighbourhood Guide
PGs & Hostels near HBR Layout
- Rent bands, deposit norms and best gates to enter
- Commute times to tech corridors & colleges
