Veerannapalya Blue Line metro station under construction, April 2026
Blue LineUnder Construction

Veerannapalya Metro Station

ವೀರಣ್ಣಪಾಳ್ಯ

Station Code: Not officially released

Outer Ring Road, Veerannapalya, Bengaluru, Karnataka 560045

About Veerannapalya

Veerannapalya Metro Station: Blue Line, Namma Metro

Veerannapalya Metro Station is an elevated station on the Blue Line of Namma Metro in Bengaluru, on the Outer Ring Road at Veerannapalya. It is on the airport line (Phase 2B) and serves Veerannapalya, Manyata Embassy Business Park’s western side and Karle Town Centre. The Blue Line will run 58.19 km from Central Silk Board along the Outer Ring Road to KR Puram, then north through Hebbal to Kempegowda International Airport, with 29 stations. The station is under construction and not open yet.

In Kannada: ವೀರಣ್ಣಪಾಳ್ಯ.

Veerannapalya is the Blue Line’s Manyata station: the Manyata NXT towers, Hilton hotels and Manyata convention centre are within about 300 m, and Karle Town Centre is a short walk away. Nagawara, one stop east, serves the other side of the park and the Pink Line. This station was handed to a new contractor after a delay in shifting an underground gas pipeline.

Veerannapalya Metro Station Opening Date

This station is on Phase 2B, the 38.44 km airport line from KR Puram through Nagawara, Hebbal and Yelahanka to the KIAL Terminals, with 16 stations. Phase 2B is behind Phase 2A: the ORR section from Silk Board to KR Puram is in trial runs and expected in 2027, while reported targets for the airport line range from late 2027 to 2028. BMRCL has not announced an official date, so treat 2028 as a target, not a promise.

Expected opening: Around 2028, target only (Phase 2B airport line; no official date). Status verified 15 November 2026.

Where Veerannapalya is on the Blue Line

The previous station towards Central Silk Board is Nagawara (about 0.7 km) and the next station towards the airport is Kempapura (about 1.4 km). Veerannapalya will be 19 stops (about 48 min) from Central Silk Board (Yellow Line); 7 stops (about 18 min) from KR Puram (Purple Line); 1 stop (about 2 min) from Nagawara (Pink Line); and 9 stops (about 22 min) from KIAL Terminals at the airport. Times assume Namma Metro’s usual pace of about 2.5 minutes a stop (our estimate until BMRCL publishes running times).

See every station in order on the Blue Line page, and the trial-run timeline in our Blue Line guide.

What is near Veerannapalya Metro Station

  • Manyata NXT Tower 2: about 180 m, 3 min walk
  • Hilton Garden Inn, Manyata: about 242 m, 4 min walk
  • Manyata Convention Centre: about 275 m, 4 min walk
  • Karle Town Centre: about 554 m, 9 min walk

Straight-line distances from the station site (OpenStreetMap); walking times are estimates. Station exits have not been announced, so the walk may change once the gates are known.

Getting to the metro from Veerannapalya today

No metro station is open nearby; the Purple Line at Baiyappanahalli is about 6.7 km away. Manyata is served by BMTC buses along the ORR and company shuttles until the Blue and Pink Lines arrive. Compare routes and fares on Plan Trip.

Veerannapalya Metro Station Timings and Fares

First and last train times and fares have not been published, because the Blue Line has not opened. Namma Metro charges by distance; if the Blue Line follows the current fare slabs, a trip of up to 2 stops would cost about ₹10 and Central Silk Board to KR Puram about ₹60, but airport fares may be set differently. We will publish verified timings here as soon as BMRCL releases the timetable. Fares for open lines: metro fare calculator.

Facilities at Veerannapalya Metro Station

The station is not open, so BMRCL has not confirmed its exits, parking or facilities. We do not list facilities we have not verified; this page will be updated when the station opens.

Veerannapalya Metro Station Map & Route Map

Location

Veerannapalya Metro Station, Bengaluru

Outer Ring Road, Veerannapalya, Bengaluru, Karnataka 560045

Open in Maps
🚧

Station Under Construction

This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: Around 2028, target only (Phase 2B airport line; no official date)

Frequently Asked Questions

Explore near Veerannapalya

Neighbourhood Guide

PGs & Hostels near Veerannapalya

  • Rent bands, deposit norms and best gates to enter
  • Commute times to tech corridors & colleges
View neighbourhood guide

Stations on the Same Line

View all