Hebbal Blue Line metro station under construction, September 2026
Blue LineUnder Construction

Hebbal Metro Station

ಹೆಬ್ಬಾಳ

Station Code: Not officially released

Hebbal Flyover Junction, Bellary Road, Bengaluru, Karnataka 560024

About Hebbal

Hebbal Metro Station: Blue Line, Namma Metro

Hebbal Metro Station is an elevated station on the Blue Line of Namma Metro in Bengaluru, at the Hebbal flyover junction, where the Outer Ring Road meets Bellary Road. It is on the airport line (Phase 2B) and serves Hebbal, Kempapura, Hebbal Lake and the Bellary Road flyover junction. The Blue Line will run 58.19 km from Central Silk Board along the Outer Ring Road to KR Puram, then north through Hebbal to Kempegowda International Airport, with 29 stations. The station is under construction and not open yet.

In Kannada: ಹೆಬ್ಬಾಳ.

Hebbal is where the Blue Line turns north from the ORR onto Bellary Road towards the airport. The station is close to the Hebbal bus station, Esteem Mall and Hebbal railway station, and it is planned as an interchange with the approved Phase 3 lines, so it is likely to become one of the busiest stations on the north side of the city.

Hebbal Metro Station Opening Date

This station is on Phase 2B, the 38.44 km airport line from KR Puram through Nagawara, Hebbal and Yelahanka to the KIAL Terminals, with 16 stations. Phase 2B is behind Phase 2A: the ORR section from Silk Board to KR Puram is in trial runs and expected in 2027, while reported targets for the airport line range from late 2027 to 2028. BMRCL has not announced an official date, so treat 2028 as a target, not a promise.

Expected opening: Around 2028, target only (Phase 2B airport line; no official date). Status verified 15 November 2026.

Where Hebbal is on the Blue Line

The previous station towards Central Silk Board is Kempapura (about 1.3 km) and the next station towards the airport is Kodigehalli (about 1.4 km). Hebbal will be 21 stops (about 52 min) from Central Silk Board (Yellow Line); 9 stops (about 22 min) from KR Puram (Purple Line); 3 stops (about 8 min) from Nagawara (Pink Line); and 7 stops (about 18 min) from KIAL Terminals at the airport. Times assume Namma Metro’s usual pace of about 2.5 minutes a stop (our estimate until BMRCL publishes running times).

See every station in order on the Blue Line page, and the trial-run timeline in our Blue Line guide.

What is near Hebbal Metro Station

  • Hebbal bus station: about 178 m, 3 min walk
  • Esteem Mall: about 568 m, 9 min walk
  • Hebbal railway station: about 765 m, 12 min walk
  • Manipal Hospital, Hebbal: about 778 m, 13 min walk
  • Hebbal Lake: about 819 m, 13 min walk

Straight-line distances from the station site (OpenStreetMap); walking times are estimates. Station exits have not been announced, so the walk may change once the gates are known.

Getting to the metro from Hebbal today

The nearest open station is Yeshwanthpura on the Green Line, about 5.2 km away, reached by bus along the ORR. Hebbal bus station has frequent buses to the city, Yeshwanthpur and the airport. Compare routes and fares on Plan Trip.

Hebbal Metro Station Timings and Fares

First and last train times and fares have not been published, because the Blue Line has not opened. Namma Metro charges by distance; if the Blue Line follows the current fare slabs, a trip of up to 2 stops would cost about ₹10 and Central Silk Board to KR Puram about ₹60, but airport fares may be set differently. We will publish verified timings here as soon as BMRCL releases the timetable. Fares for open lines: metro fare calculator.

Facilities at Hebbal Metro Station

The station is not open, so BMRCL has not confirmed its exits, parking or facilities. We do not list facilities we have not verified; this page will be updated when the station opens.

Hebbal Metro Station Map & Route Map

Location

Hebbal Metro Station, Bengaluru

Hebbal Flyover Junction, Bellary Road, Bengaluru, Karnataka 560024

Open in Maps
🚧

Station Under Construction

This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: Around 2028, target only (Phase 2B airport line; no official date)

Frequently Asked Questions

Explore near Hebbal

Neighbourhood Guide

PGs & Hostels near Hebbal

  • Rent bands, deposit norms and best gates to enter
  • Commute times to tech corridors & colleges
View neighbourhood guide

Stations on the Same Line

View all