Hulimavu
Pink LineUnder Construction

Hulimavu Metro Station

Station Code: Not officially released

Hulimavu, Bannerghatta Road, Bengaluru, Karnataka 560076

About Hulimavu

Hulimavu Metro Station — Pink Line, Namma Metro

Hulimavu Metro Station is an elevated station on the Pink Line of Namma Metro in Bengaluru, at Hulimavu, Bannerghatta Road. The Pink Line runs 21.25 km from Kalena Agrahara in the south to Nagawara in the north across 18 stations — six elevated along Bannerghatta Road and twelve underground through central Bengaluru, the longest underground stretch on the network. The line has not yet opened to passengers.

Hulimavu serves one of the densest stretches of Bannerghatta Road, a corridor that has grown heavily residential over the past decade while remaining entirely dependent on road traffic. The Pink Line is the first rail access this part of south Bengaluru will have.

Hulimavu Metro Station Opening Date

The elevated Phase 1 section, six stations from Kalena Agrahara to Tavarekere, has not opened. It has slipped repeatedly: from December 2025, to May 2026, to July 2026, to a 15 August 2026 target that was also missed. The remaining blocker is a single independent safety assessment certificate for the signalling system.

Expected opening: Late August or early September 2026 (Phase 1, elevated). Status verified 31 August 2026.

Pink Line Phase 1 timeline

  • Dec 2024 — Tunnelling completed. The last of nine tunnel boring machines, Bhadra, broke through at Nagawara.
  • Apr–May 2026 — RDSO oscillation and emergency braking distance trials on the elevated section.
  • 4 Jun 2026 — RDSO issued the speed certificate after 12 days of oscillation trials. Trains cleared for 90 kmph.
  • 14 Aug 2026 — CMRS inspection of the Kalena Agrahara–Tavarekere stretch concluded. Trains and stations passed, but clearance was withheld pending the independent signalling safety assessment certificate.
  • 15 Aug 2026 — The target opening date was missed.
  • Now — BMRCL expects the elevated section to open in late August or early September 2026, once the signalling certificate and formal CMRS clearance are issued.

Hulimavu Metro Station Map & Route Map

The previous station is Kalena Agrahara Metro Station and the next is IIM Bangalore Metro Station. Once the underground section opens, Hulimavu will have a direct run to Dairy Circle, MG Road and Shivajinagar without changing trains. The Pink Line will interchange with the Yellow Line at Jayadeva Hospital and with the Purple Line at Mahatma Gandhi Road, and Nagawara is planned as a future interchange with the Blue Line towards Kempegowda International Airport.

What is Near Hulimavu Metro Station

Hulimavu Lake is a short distance from the station, and Royal Meenakshi Mall sits on the same stretch of Bannerghatta Road.

Hulimavu Metro Station Timings

First and last train timings for Hulimavu Metro Station have not been published. When services begin, BMRCL has indicated Pink Line trains will run from about 5:30 am to 11:00 pm, with 5 to 7 minute frequencies at peak and 8 to 12 minutes off-peak, matching the Purple and Green Lines. These figures are BMRCL projections and have not been confirmed in a published timetable. We will publish verified per-direction times here once BMRCL releases the timetable.

Facilities at Hulimavu Metro Station

Hulimavu Metro Station is not yet open, so facilities, entry and exit gates and parking have not been confirmed by BMRCL. We do not list facilities for stations we have not verified. This page will be updated when the station opens.

Hulimavu Metro Station Map & Route Map

Location

Hulimavu Metro Station, Bengaluru

Hulimavu, Bannerghatta Road, Bengaluru, Karnataka 560076

Open in Maps
🚧

Station Under Construction

This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: Late August or early September 2026 (Phase 1, elevated)

Frequently Asked Questions

The elevated Phase 1 section, six stations from Kalena Agrahara to Tavarekere, has not opened. It has slipped repeatedly: from December 2025, to May 2026, to July 2026, to a 15 August 2026 target that was also missed. The remaining blocker is a single independent safety assessment certificate for the signalling system. Expected opening: Late August or early September 2026 (Phase 1, elevated). Status verified 31 August 2026.

Explore near Hulimavu

Neighbourhood Guide

PGs & Hostels near Hulimavu

  • Rent bands, deposit norms and best gates to enter
  • Commute times to tech corridors & colleges
View neighbourhood guide

Stations on the Same Line

View all