Lakkasandra
Pink LineUnder Construction

Lakkasandra Metro Station

ಲಕ್ಕಸಂದ್ರ

Station Code: Not officially released

Lakkasandra, Wilson Garden, Bengaluru, Karnataka 560030

About Lakkasandra

Lakkasandra Metro Station — Pink Line, Namma Metro

Lakkasandra Metro Station is an underground station on the Pink Line of Namma Metro in Bengaluru, at Lakkasandra, Wilson Garden. The Pink Line runs 21.25 km from Kalena Agrahara in the south to Nagawara in the north across 18 stations — six elevated along Bannerghatta Road and twelve underground through central Bengaluru, the longest underground stretch on the network. Only the elevated section opens on 13 November 2026; this underground section has not opened yet.

Not opening on 13 November. Only the Pink Line’s six elevated stations, Kalena Agrahara to Tavarekere on Bannerghatta Road, open on 13 November 2026, inaugurated by Prime Minister Narendra Modi. Lakkasandra is on the underground section, which is expected around May 2027.

Lakkasandra is an underground station serving Lakkasandra and Wilson Garden, dense older residential neighbourhoods just off Hosur Road that have had no rail access at all. These are exactly the sort of inner areas the Pink Line’s underground alignment was designed to reach.

Lakkasandra Metro Station Opening Date

This station is on the underground Phase 2 section — 13.76 km and twelve stations from Dairy Circle to Nagawara, the longest underground stretch on the Namma Metro network. It is now expected around May 2027 (the earlier target was December 2026). Tunnelling finished in December 2024; track, signalling and platform screen door installation followed, and platform screen doors have been tested at Mahatma Gandhi Road. Treat May 2027 as a target rather than a commitment — the elevated section slipped several times before its 13 November 2026 opening.

Expected opening: around May 2027, target only (Phase 2, underground; earlier target December 2026). Status verified 3 November 2026.

Getting to the Pink Line from Lakkasandra today

Until this underground section opens, the nearest working metro station is Lalbagh on the Green Line, about 1.9 km away. Every route from here to the open Pink Line stations ends the same way: take the Yellow Line to Jayadeva Hospital and change to the Pink Line for Tavarekere, JP Nagar 4th Phase, IIMB-Bilekahalli, Hulimavu and Kalena Agrahara. Use the Pink Line fare and time checker for the fare and journey time from your station.

Lakkasandra Metro Station Map & Route Map

The previous station is Dairy Circle Metro Station and the next is Langford Town Metro Station. It sits two stops north of Dairy Circle, on the run in towards Richmond Town and MG Road. The Pink Line will interchange with the Yellow Line at Jayadeva Hospital and with the Purple Line at Mahatma Gandhi Road, and Nagawara is planned as a future interchange with the Blue Line towards Kempegowda International Airport.

What is Near Lakkasandra Metro Station

The station serves Lakkasandra and Wilson Garden, with the Hosur Road hospital cluster and Adugodi nearby.

Lakkasandra Metro Station Timings

First and last train timings for Lakkasandra Metro Station have not been published. When services begin, BMRCL has indicated Pink Line trains will run from about 5:30 am to 11:00 pm, with 5 to 7 minute frequencies at peak and 8 to 12 minutes off-peak, matching the Purple and Green Lines. These figures are BMRCL projections and have not been confirmed in a published timetable. We will publish verified per-direction times here once BMRCL releases the timetable.

Facilities at Lakkasandra Metro Station

Lakkasandra Metro Station is not yet open, so facilities, entry and exit gates and parking have not been confirmed by BMRCL. We do not list facilities for stations we have not verified. This page will be updated when the station opens.

Lakkasandra Metro Station Map & Route Map

Location

Lakkasandra Metro Station, Bengaluru

Lakkasandra, Wilson Garden, Bengaluru, Karnataka 560030

Open in Maps
🚧

Station Under Construction

This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: Around May 2027, target only (Phase 2, underground; earlier target December 2026)

Frequently Asked Questions

Explore near Lakkasandra

Neighbourhood Guide

PGs & Hostels near Lakkasandra

  • Rent bands, deposit norms and best gates to enter
  • Commute times to tech corridors & colleges
View neighbourhood guide

Stations on the Same Line

View all