
Tannery Road Metro Station
Station Code: Not officially released
About Tannery Road
Tannery Road Metro Station — Pink Line, Namma Metro
Tannery Road Metro Station is an underground station on the Pink Line of Namma Metro in Bengaluru, at Tannery Road. The Pink Line runs 21.25 km from Kalena Agrahara in the south to Nagawara in the north across 18 stations — six elevated along Bannerghatta Road and twelve underground through central Bengaluru, the longest underground stretch on the network. The line has not yet opened to passengers.
Tannery Road is an underground station along one of north Bengaluru’s most densely populated corridors. The area is a mix of residential streets and small-scale commerce, and the station will connect it directly to the central business district for the first time.
Tannery Road Metro Station Opening Date
This station is on the underground Phase 2 section — 13.76 km and twelve stations from Dairy Circle to Nagawara, the longest underground stretch on the Namma Metro network. BMRCL is targeting December 2026. Tunnelling finished in December 2024; track, signalling and platform screen door installation followed, and platform screen doors have been tested at Mahatma Gandhi Road. Treat December 2026 as a target rather than a commitment — Phase 1 has already slipped four times.
Expected opening: December 2026, target only (Phase 2, underground). Status verified 31 August 2026.
Tannery Road Metro Station Map & Route Map
The previous station is Pottery Town Metro Station and the next is Venkateshpura Metro Station. It is four stops from Nagawara, the northern terminus, and five stops from the Purple Line interchange at Mahatma Gandhi Road. The Pink Line will interchange with the Yellow Line at Jayadeva Hospital and with the Purple Line at Mahatma Gandhi Road, and Nagawara is planned as a future interchange with the Blue Line towards Kempegowda International Airport.
What is Near Tannery Road Metro Station
The station serves the Tannery Road corridor and the surrounding residential and commercial areas of north Bengaluru.
Tannery Road Metro Station Timings
First and last train timings for Tannery Road Metro Station have not been published. When services begin, BMRCL has indicated Pink Line trains will run from about 5:30 am to 11:00 pm, with 5 to 7 minute frequencies at peak and 8 to 12 minutes off-peak, matching the Purple and Green Lines. These figures are BMRCL projections and have not been confirmed in a published timetable. We will publish verified per-direction times here once BMRCL releases the timetable.
Facilities at Tannery Road Metro Station
Tannery Road Metro Station is not yet open, so facilities, entry and exit gates and parking have not been confirmed by BMRCL. We do not list facilities for stations we have not verified. This page will be updated when the station opens.
Tannery Road Metro Station Map & Route Map
Location
Tannery Road Metro Station, Bengaluru
Tannery Road, Bengaluru, Karnataka 560045
Station Under Construction
This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: December 2026, target only (Phase 2, underground)
Frequently Asked Questions
This station is on the underground Phase 2 section — 13.76 km and twelve stations from Dairy Circle to Nagawara, the longest underground stretch on the Namma Metro network. BMRCL is targeting December 2026. Tunnelling finished in December 2024; track, signalling and platform screen door installation followed, and platform screen doors have been tested at Mahatma Gandhi Road. Treat December 2026 as a target rather than a commitment — Phase 1 has already slipped four times. Expected opening: December 2026, target only (Phase 2, underground). Status verified 31 August 2026.
Explore near Tannery Road
Neighbourhood Guide
PGs & Hostels near Tannery Road
- Rent bands, deposit norms and best gates to enter
- Commute times to tech corridors & colleges
