
Tannery Road Metro Station
ಟ್ಯಾನರಿ ರಸ್ತೆ
Station Code: Not officially released
About Tannery Road
Tannery Road Metro Station — Pink Line, Namma Metro
Tannery Road Metro Station is an underground station on the Pink Line of Namma Metro in Bengaluru, at Tannery Road. The Pink Line runs 21.25 km from Kalena Agrahara in the south to Nagawara in the north across 18 stations — six elevated along Bannerghatta Road and twelve underground through central Bengaluru, the longest underground stretch on the network. Only the elevated section opens on 13 November 2026; this underground section has not opened yet.
Not opening on 13 November. Only the Pink Line’s six elevated stations, Kalena Agrahara to Tavarekere on Bannerghatta Road, open on 13 November 2026, inaugurated by Prime Minister Narendra Modi. Tannery Road is on the underground section, which is expected around May 2027.
Tannery Road is an underground station along one of north Bengaluru’s most densely populated corridors. The area is a mix of residential streets and small-scale commerce, and the station will connect it directly to the central business district for the first time.
Tannery Road Metro Station Opening Date
This station is on the underground Phase 2 section — 13.76 km and twelve stations from Dairy Circle to Nagawara, the longest underground stretch on the Namma Metro network. It is now expected around May 2027 (the earlier target was December 2026). Tunnelling finished in December 2024; track, signalling and platform screen door installation followed, and platform screen doors have been tested at Mahatma Gandhi Road. Treat May 2027 as a target rather than a commitment — the elevated section slipped several times before its 13 November 2026 opening.
Expected opening: around May 2027, target only (Phase 2, underground; earlier target December 2026). Status verified 3 November 2026.
Getting to the Pink Line from Tannery Road today
Until this underground section opens, the nearest working metro station is Cubbon Park on the Purple Line, about 3.6 km away. Every route from here to the open Pink Line stations ends the same way: take the Yellow Line to Jayadeva Hospital and change to the Pink Line for Tavarekere, JP Nagar 4th Phase, IIMB-Bilekahalli, Hulimavu and Kalena Agrahara. Use the Pink Line fare and time checker for the fare and journey time from your station.
Tannery Road Metro Station Map & Route Map
The previous station is Pottery Town Metro Station and the next is Venkateshpura Metro Station. It is four stops from Nagawara, the northern terminus, and five stops from the Purple Line interchange at Mahatma Gandhi Road. The Pink Line will interchange with the Yellow Line at Jayadeva Hospital and with the Purple Line at Mahatma Gandhi Road, and Nagawara is planned as a future interchange with the Blue Line towards Kempegowda International Airport.
What is Near Tannery Road Metro Station
The station serves the Tannery Road corridor and the surrounding residential and commercial areas of north Bengaluru.
Tannery Road Metro Station Timings
First and last train timings for Tannery Road Metro Station have not been published. When services begin, BMRCL has indicated Pink Line trains will run from about 5:30 am to 11:00 pm, with 5 to 7 minute frequencies at peak and 8 to 12 minutes off-peak, matching the Purple and Green Lines. These figures are BMRCL projections and have not been confirmed in a published timetable. We will publish verified per-direction times here once BMRCL releases the timetable.
Facilities at Tannery Road Metro Station
Tannery Road Metro Station is not yet open, so facilities, entry and exit gates and parking have not been confirmed by BMRCL. We do not list facilities for stations we have not verified. This page will be updated when the station opens.
Tannery Road Metro Station Map & Route Map
Location
Tannery Road Metro Station, Bengaluru
Tannery Road, Bengaluru, Karnataka 560045
Station Under Construction
This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: Around May 2027, target only (Phase 2, underground; earlier target December 2026)
Frequently Asked Questions
Explore near Tannery Road
Neighbourhood Guide
PGs & Hostels near Tannery Road
- Rent bands, deposit norms and best gates to enter
- Commute times to tech corridors & colleges
