
Kadugondanahalli Metro Station
Station Code: Not officially released
About Kadugondanahalli
Kadugondanahalli Metro Station — Pink Line, Namma Metro
Kadugondanahalli Metro Station is an underground station on the Pink Line of Namma Metro in Bengaluru, at Kadugondanahalli. The Pink Line runs 21.25 km from Kalena Agrahara in the south to Nagawara in the north across 18 stations — six elevated along Bannerghatta Road and twelve underground through central Bengaluru, the longest underground stretch on the network. The line has not yet opened to passengers.
Formerly named Arabic College, this underground station serves Kadugondanahalli, shortened locally to KG Halli. The renaming means searches for both names lead to the same station, and the older name is still in common use among residents.
Kadugondanahalli Metro Station Opening Date
This station is on the underground Phase 2 section — 13.76 km and twelve stations from Dairy Circle to Nagawara, the longest underground stretch on the Namma Metro network. BMRCL is targeting December 2026. Tunnelling finished in December 2024; track, signalling and platform screen door installation followed, and platform screen doors have been tested at Mahatma Gandhi Road. Treat December 2026 as a target rather than a commitment — Phase 1 has already slipped four times.
Expected opening: December 2026, target only (Phase 2, underground). Status verified 31 August 2026.
Kadugondanahalli Metro Station Map & Route Map
The previous station is Venkateshpura Metro Station and the next is Nagawara Metro Station. It is the last stop before Nagawara, the northern terminus of the Pink Line. The Pink Line will interchange with the Yellow Line at Jayadeva Hospital and with the Purple Line at Mahatma Gandhi Road, and Nagawara is planned as a future interchange with the Blue Line towards Kempegowda International Airport.
What is Near Kadugondanahalli Metro Station
The station serves Kadugondanahalli and KG Halli, close to the Arabic College the station was originally named after.
Kadugondanahalli Metro Station Timings
First and last train timings for Kadugondanahalli Metro Station have not been published. When services begin, BMRCL has indicated Pink Line trains will run from about 5:30 am to 11:00 pm, with 5 to 7 minute frequencies at peak and 8 to 12 minutes off-peak, matching the Purple and Green Lines. These figures are BMRCL projections and have not been confirmed in a published timetable. We will publish verified per-direction times here once BMRCL releases the timetable.
Facilities at Kadugondanahalli Metro Station
Kadugondanahalli Metro Station is not yet open, so facilities, entry and exit gates and parking have not been confirmed by BMRCL. We do not list facilities for stations we have not verified. This page will be updated when the station opens.
Kadugondanahalli Metro Station Map & Route Map
Location
Kadugondanahalli Metro Station, Bengaluru
Kadugondanahalli, Bengaluru, Karnataka 560045
Station Under Construction
This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: December 2026, target only (Phase 2, underground)
Frequently Asked Questions
This station is on the underground Phase 2 section — 13.76 km and twelve stations from Dairy Circle to Nagawara, the longest underground stretch on the Namma Metro network. BMRCL is targeting December 2026. Tunnelling finished in December 2024; track, signalling and platform screen door installation followed, and platform screen doors have been tested at Mahatma Gandhi Road. Treat December 2026 as a target rather than a commitment — Phase 1 has already slipped four times. Expected opening: December 2026, target only (Phase 2, underground). Status verified 31 August 2026.
Explore near Kadugondanahalli
Neighbourhood Guide
PGs & Hostels near Kadugondanahalli
- Rent bands, deposit norms and best gates to enter
- Commute times to tech corridors & colleges
