Venkateshpura Metro Station
Station Code: Not officially released
About Venkateshpura
Venkateshpura Metro Station — Pink Line, Namma Metro
Venkateshpura Metro Station is an underground station on the Pink Line of Namma Metro in Bengaluru, at Venkateshpura. The Pink Line runs 21.25 km from Kalena Agrahara in the south to Nagawara in the north across 18 stations — six elevated along Bannerghatta Road and twelve underground through central Bengaluru, the longest underground stretch on the network. The line has not yet opened to passengers.
Venkateshpura is an underground station serving the Venkateshpura and Kaval Byrasandra neighbourhoods of north Bengaluru, a residential belt between Tannery Road and Kadugondanahalli.
Venkateshpura Metro Station Opening Date
This station is on the underground Phase 2 section — 13.76 km and twelve stations from Dairy Circle to Nagawara, the longest underground stretch on the Namma Metro network. BMRCL is targeting December 2026. Tunnelling finished in December 2024; track, signalling and platform screen door installation followed, and platform screen doors have been tested at Mahatma Gandhi Road. Treat December 2026 as a target rather than a commitment — Phase 1 has already slipped four times.
Expected opening: December 2026, target only (Phase 2, underground). Status verified 31 August 2026.
Venkateshpura Metro Station Map & Route Map
The previous station is Tannery Road Metro Station and the next is Kadugondanahalli Metro Station. It is two stops from Nagawara, where the Pink Line will terminate and eventually meet the Blue Line to the airport. The Pink Line will interchange with the Yellow Line at Jayadeva Hospital and with the Purple Line at Mahatma Gandhi Road, and Nagawara is planned as a future interchange with the Blue Line towards Kempegowda International Airport.
What is Near Venkateshpura Metro Station
The station serves Venkateshpura and Kaval Byrasandra, with the RT Nagar area a short distance away.
Venkateshpura Metro Station Timings
First and last train timings for Venkateshpura Metro Station have not been published. When services begin, BMRCL has indicated Pink Line trains will run from about 5:30 am to 11:00 pm, with 5 to 7 minute frequencies at peak and 8 to 12 minutes off-peak, matching the Purple and Green Lines. These figures are BMRCL projections and have not been confirmed in a published timetable. We will publish verified per-direction times here once BMRCL releases the timetable.
Facilities at Venkateshpura Metro Station
Venkateshpura Metro Station is not yet open, so facilities, entry and exit gates and parking have not been confirmed by BMRCL. We do not list facilities for stations we have not verified. This page will be updated when the station opens.
Venkateshpura Metro Station Map & Route Map
Location
Venkateshpura Metro Station, Bengaluru
Venkateshpura, Bengaluru, Karnataka 560045
Station Under Construction
This station is currently under construction and not yet operational. Facilities, entry/exit points, and train timings will be updated once it opens.Expected Opening: December 2026, target only (Phase 2, underground)
Frequently Asked Questions
This station is on the underground Phase 2 section — 13.76 km and twelve stations from Dairy Circle to Nagawara, the longest underground stretch on the Namma Metro network. BMRCL is targeting December 2026. Tunnelling finished in December 2024; track, signalling and platform screen door installation followed, and platform screen doors have been tested at Mahatma Gandhi Road. Treat December 2026 as a target rather than a commitment — Phase 1 has already slipped four times. Expected opening: December 2026, target only (Phase 2, underground). Status verified 31 August 2026.
Explore near Venkateshpura
Neighbourhood Guide
PGs & Hostels near Venkateshpura
- Rent bands, deposit norms and best gates to enter